Wednesday, November 26, 2014

Thanksgiving Eve

It was a chilly Wednesday morning. Nate and "Little" Mike arrived to continue with the carpentry work. The forecast is for snow to begin around 10:00 am and continue throughout the day. Josh (electric) arrived just after 7:00 am to install the additional conduit in the trench between the garage and basement. "Our" Mike showed up with additional lumber. The cable company guy is scheduled to be here to pull their cable through the new underground conduit.

The lumber company fellow stopped by and he talked with Mike for quite a while. He brought another wood sample for us to consider for the sunroom exposed roof. Mike told us later that he was told that the cypress roofing planks, that he showed me yesterday, were four to five times the cost of the wood he showed us today. It is a tongue and groove with a V notch. We could opt to either have the notch exposed or not if it makes the interior roof look too "busy". It will be stained. Mike believes these planks are spruce.The exposed trusses will be yellow pine. The bar and paneling will be Sapele. The decking and interior steps will be Tiger wood. The interior door and window sashes will be pine. We will need to work with Tyler, and perhaps Bob (bar cabinetry), to ensure the staining of all these different woods will coordinate.

The snow held off until around noon, but by 1:00 pm, it was coming down pretty heavy and the guys knocked off for the day. They finished the sunroom plywood facings and got a good start on the Tyvek wrap. By 4:30 pm, the snow had essentially stopped. We got about 1-1/2". It will not stay around long.


"Bobcat" Tom showed up and filled in the trench after the electrician finished laying conduit. While the alley is filled and level, it is now muddy and needs new gravel. Mike said it will be next week before that could happen.




T made her decision on the swing direction of the sunroom casement windows and I communicated that to "Salesman" Mike. All of the hot tub bay windows will swing in one direction. As for the four casements on the sunroom south wall, two will open left and two right. 

As soon as "Our" Mike gets the south door side windows and overhead window dimensions, we would be able to place the Marvin order. I don't know if Mike ever placed the Lincoln order. He did not ask for us to make a down payment.

The cable guy never showed up.

Happy Thanksgiving to everyone!

Tuesday, November 25, 2014

Chilly Busy Tuesday

Nate and "Little" Mike showed up this morning to continue carpentry work. I moved both the cars back out to the front of the house. I moved them around back last night due to potential issues associated with the Ferguson grand jury decision. Our vehicles were almost the only ones remaining on Russell Boulevard (everyone else had relocated theirs). As this made them very conspicuous, it seemed a prudent precaution. Thankfully, there have been no events on our block, yet.

"Our" Mike and Tyler (architect) showed up later in the morning and I went out to listen to the discussion regarding the garage floor height. The result was that the floor will be lowered 4-1/2" by adding three 2x4" spacers to each door frame. This will minimize the slope of the entry apron.

Mike and Tyler also discussed the wood to be used on the interior exposed sunroom roof. Mike had previously suggested the use of fir. Today however, he suggested to Tyler that we might use spruce. Tyler cautioned that spruce does not take a stain very well and suggested a treatment may be required prior to staining. Tyler offered to take samples to their shop to determine the stain formula. I requested that they include T in any decision regarding the stain to be used. Mike then showed both of us a sample of cypress wood that he recently was given. Tyler really liked them and they were very nice. In Tyler's opinion, if the cost was reasonable, that was the way to go. Intuitively, using cypress sounds appealing due to my latent concern of moisture exposure.

In regards to the windows on either side of the south entry door, Nate and "Little" Mike had raised the top of the frames to match the top of the door. I asked "Our" Mike about this and he said he decided it would be best to go with a custom non-standard size window. I asked about the added cost. The number he gave me would increase cost about 7%. That is acceptable and was later confirmed by "Salesman" Mike (Marvin window dealer).

In an attempt to finalize our window order, I told both Mike and Tyler that we were planning to put a stained glass window above the south door. I also got Tyler's opinion on the direction of swing ("handings") of the casement windows. His opinion coincided with mine, in that, all the bay windows should be left-handed, which would maximize the air flow, minimize the traffic noise and give the room a very smooth and uniform appearance. The only thing remaining is for T to decide.

Mike said he received my note requesting to have Rob (electric) include a power cable from the garage to the basement. This would be used to transfer power from our gasoline powered portable generator in the garage to an outlet in the basement. Mike said this would required an additional conduit to be laid between the garage and the basement. Mike also said I could contact our cable company and arrange for them to come out and pull wire through the conduits to replace the overhead line.

"Salesman" Mike (Marvin Windows) called and said once he gets the dimensions of the window opening above the south door, he will quote us the cost of a simple picture window (both single pane and double pane). We will have the option of either removing the clear glass pane(s) and replace it with the stained glass or we can put the stained glass behind the clear glass. The later option makes the most sense as it will improve the thermal insulation as well as provide some measure of protection to the stained glass. This is the stained glass design we are going to use. T will work with the craftsmen on the colors.


I also called, and left a message, for Bobby (fireplace) today to get the order placed for the fireplace so we can capture the November rebate. Bobby returned my call late in the afternoon after, apparently, talking with "Our" Mike. Bobby said he would place the order and I could send the down payment. Bobby confirmed the quote was on an installed basis. I queried Bobby as to whether he believed he would need a permit from the City. Bobby's store is located somewhere in Illinois and, based upon his conversation with "Our" Mike, he did not believe he would need at City permit. I told him to be careful and not to get into the same trouble as our HVAC contractor. Later, when I was talking with "Our" Mike, I mentioned that Bobby did not believe he needed a permit. Mike was pretty sure he would need one. I can see another Stop Work Order in our future!

Mike had the slate roofing guy out today to finalize the quote. This guy is going to not only roof the new addition, but also the main house.

Tomorrow, we are expecting Nate, "Little" Mike and "Our" Mike back out. Mike said we should be close to starting to work on the connecting porch between the main house and the sunroom. We also should have the electrician out to lay the additional conduit and the cable company to pull cable through the new conduit. We might have "Bobcat" Tom show up to start filling in the trench. We also need to get some gravel on the alley. It is a muddy mess and the neighbors have noticed. Mike is aware.

"Our" Mike said Rob is working with Ameren (power utility) to get scheduled to have power lines pulled through the new conduit. Once accomplished, the next milestone will be getting everything under roof.

By the end of the day, Nate and "Little" Mike had added more shape to the sunroom. It is really nice to see progress!!!




Monday, November 24, 2014

Trim Color

T and I went back to the supplier of Lincoln windows and doors for the garage today and confirmed that their standard bronze trim will be acceptable. An email was sent to "Our" Mike that this was our selection and that we told the supplier that Mike would be getting with them to authorize the order. They also showed us the proposed replacement basement door. We told "Our" Mike that this was acceptable as well.

Since we are also at the point of actually placing the order for the sunroom Marvin windows and doors, we have to finalize our decision on which way we want the casement windows to swing. We have analyzed prevailing wind directions, traffic noise, neighbor pet noise, general ventilation, security issues and overall aesthetics. After all of that analyzing, I came to the conclusion that I was over analyzing the situation. My selection was one that seemed to me to be the most aesthetically appealing. I also concluded that, since I don't believe there is really a "wrong" answer, the only "right" answer is what T wants to do. I have sketched up several options to help her visualize. Once she makes up her mind, we can let "Salesman" Mike know and he can get the order placed. However, he said he is also waiting to hear back from "Our" Mike on the height of the windows on either side of the south door. If we get the order placed this week, delivery will probably be after Christmas and maybe after the new year.