Vern's boys finished the new incoming domestic water line. They will be back probably Monday to remove the steel cover plates in the street. The City is responsible for application of new asphalt.
New Shutoff Valve |
Tap into Water Main |
New Basement Shutoff Valve and New Line |
John and Tim finished the new on-demand domestic hot water heater installation. T has already tested it, filling the tub for a delightful soak. It seemed to work well.
Frank joined John and Tim for awhile today and we talked about the new boiler, to be installed next. Frank gave me a piping drawing and a sketch of the floor plumbing for the radiant floor heating. There will be three zones and will include heating of the connecting porch between the house and the sunroom. The floor loops are on 8" centers and will be embedded in the concrete floor slab.