We had some heavy rain and hail last night. Other than a couple of small branches down, no damage. It had cleared by daylight and did not start raining again until this evening.

The guttering guys showed back up and finished the garage and started on the sunroom. The masonry people also showed up and got after the installation of the limestone window sills. They miscalculated the space needed for the garage sills and they had to rip out some of the bricks they had previously laid. Mike was here to look over things and said he expected them to complete the guttering and masonry today. Neither the guttering or the masonry were finished. While all the sills are in place, they still need to be grouted. T has not yet determined whether she wants the sill to be painted to match those on the main house or leave them white. Once the sills are complete, Mike can finish the trim around the windows.


Limestone Sills





Yes, we still have the 2x4's holding up the south porch roof. T discussed the south porch roof brackets with Mike this morning. She showed him a design she likes and he will have the lumber people cut them out. It will supposedly look something like this...

The electrician did not show up today. Mike seemed a little disappointed that Chris worked all day on the garage wiring because he is waiting for the sunroom wiring.

Mike said the Tiger Wood decking will arrive tomorrow.