Friday, July 17, 2015

Thursday

Mild day without rain. We actually parked the car in the garage last night for the first time since the floor was poured. When Nate arrived today, he removed all the packing and shipping materials from the garage windows. It looks a lot better!

The landscaping work continued with walls being built. Bob II asked us about the power to be run into the yard. He said he would install stakes where we wanted Chris to run the power. We confirmed with him that there are two potential locations for pole lamps. I also learned that T wants to have a receptacle at the sitting wall on the east side of the chess board. This sitting wall was not even depicted on Bob's drawing. However, T assured us that this was the plan. Bob said that was not a problem. Bob did not mention any update on the aggrigate situation.




Mike and Nate framed the hot tub deck steps and Nate started digging post holes for the sunroom south porch. Mike seemed to be concentrating on exterior caulking before the painters return.



They also installed the Sapele panels on either side of the chimney breast. Still do not know when the masonry people are expected to start the stone work. The porcelain floor tiles have not been delivered yet either.

Chris (electrical) has not done any work all week. Frank (HAC) has not resumed the installation work on the heat pump yet. He told us yesterday we expected to complete it either this week or early next week. Frank did send us a quote for replacing the AC units. Impressive.

No communication from the solar people. It was partly cloudy today, but again, the maximum power output was not over 6 kW.

No comments: